Simulate the crowd before it arrives
Kinetiq models how people move through stations, terminals, venues and festival grounds, so you can find bottlenecks, size exits and plan staffing before opening day.
- Entry A, street9,800
- Entry B, bus bay6,100
- Interchange, line 22,500
Trains
- Headway4 min
- Alighting per train640
Playback
Queues at 08:44
| Element | People | Wait |
|---|---|---|
| Fare gates, A | 214 | 3:06 |
| Escalator 2 | 96 | 2:22 |
| Ticket counters | 58 | 1:58 |
| Stair 1 | 22 | 0:41 |
From building model to busy platform
Import the station or site model, mark where people enter and leave, and set how many arrive each minute. Kinetiq moves every person as an individual, queuing at gates, stairs and counters, and shows you where density builds and how long people wait.

What Kinetiq does
BIM and CAD import
IFC, Revit, DWG, glTF and OBJ models, in 2D plans or full 3D with levels.
Demand profiles
Arrivals by entrance and minute, from train timetables, ticketing data or event schedules.
Agent-based movement
Each person picks a route and reacts to crowding, queues and closed paths.
Level-of-service maps
Density coloured by Fruin level of service, A to F, for every minute of the run.
Queues and wait times
At every fare gate, ticket counter, stair, escalator and lift.
Evacuation scenarios
Clearance time per exit, with blocked routes and staged alarms.
Find the bottleneck before it finds you
Density maps show where people bunch up, minute by minute. Play the run back, step through the peak, and compare two layouts side by side.
- Fruin level of service by area and minute
- Peak density and when it occurs
- Side-by-side scenario comparison

Size stairs, gates and escalators against real demand
Feed Kinetiq train arrivals, ticketing counts or gate data. It tells you how long queues get at each fare gate and escalator, and how many you need to keep waits under target.
- Queue length and wait time per element
- What-if: add a gate, reverse an escalator
- Staffing plans for peak periods
Plan evacuations and event days
Run evacuation drills on the model: block an exit, delay the alarm, add a surge at the end of a match. Kinetiq reports clearance time per exit and where people get held up.
- Clearance time per exit and level
- Blocked-route and staged-alarm scenarios
- Reports for fire NOC and safety reviews
Who uses Kinetiq
Metro and rail corporations
Station design, interchange planning and peak-hour operations.
Architects and engineers
Circulation and egress studies for terminals, malls and campuses.
Venues and event organisers
Gate plans, queue layouts and staffing for matches, concerts and fairs.
Police and disaster management
Crowd control plans for festivals, rallies and pilgrimages.
Works with your data
Kinetiq reads the formats and systems agencies already use, and exports to the ones they report in.
- IFC and Revit
- AutoCAD DWG and DXF
- glTF and OBJ
- GTFS train timetables
- AFC gate and ticketing data
- Video and image export
Questions
Which file formats can we import?
IFC, Revit, DWG, DXF, glTF and OBJ. Simple sites can also be traced from a PDF plan or satellite image.
How large a crowd can Kinetiq simulate?
Runs with more than 100,000 people are routine. Very large sites such as festival grounds are split into linked zones.
How are the movement models calibrated?
Against published pedestrian flow measurements, including Indian station data. Every report lists the parameters used so reviewers can check them.
Can we share results with people who don’t have a licence?
Yes. Every run has a link that plays back in a browser, and reports export to PDF and video.
Bring a drawing, see the crowd
Send us a station or venue plan and the expected peak. We’ll run it in Kinetiq and walk you through the results.